The modern modular building, despite its “typical” appearance, can be quite comfortable inside – spacious, comfortable, warm, have a rational layout. It is allowed to build structures with a height of the 3rd floor from the block-modules (block containers), and, for their light external trim, it is not always possible to disassemble the components of such a “designer”. This allows you to build buildings for various purposes – residential, office, industrial; Moreover, being one-story, they do not require the device of any foundation.
The most common material for the manufacture of such modules are sandwich panels, which are a polystyrene foam concluded between the two OSP plates. All this is attached on a hard metal frame, which allows you to get a solid seismic security structure. Modern modular buildings with such characteristics are an ideal solution for organizing temporary housing specialists working in a wide variety of climatic zones. Today, such a block containers can be detected in the Far North and in the southern regions where it is possible to ensure comfort of living when using various thicknesses of the thermal insulation material.
The module should be called a design that includes 2 or more block container. The dimensions of such an object often reach 14 meters in length, up to 7 in width and up to 5 – in height. Typically, a block-module includes a bathroom, boiler room, and a meal for eating. Everything else can be supplemented on the basis of the requirements of those living in this temporary structure.
Each module of the rapidly vegetable structure is originally designed to connect to urban communications, including an electric network, water and gas pipeline. The main thing is that such construction will not require large -scale construction work, which means that it is possible to achieve maximum mobility – the possibility of operational dismantling of the building and its transportation to another location.
Installation and dismantling of a container -type modular building is performed using a conventional autocrane. Practice shows that heavy special equipment will allow you to build a full-fledged 3-story residential or administrative-household complex in just one working day. Another 5 days may need to connect the object to the communications systems, after which the building will be ready to accept its temporary residents.